At a glance
Andrea Butelmann Peisajoff and Jorge Rodríguez Grossi explain how Chile's 2004 Ley Corta I turned transmission into a public service, put new lines out to international tender, and created a Panel of Experts that must settle disputes by picking one side's proposal outright.
Chile's electricity law used to leave the hardest questions to a cabinet minister. When generators fell out over how to divide the money paid by electricity customers, the file climbed to the Ministry of Economy, where lobbyists could press a political authority over what was, in substance, a fight between private firms.
That arrangement ended with Law 19,940, published on 13 March 2004 and known ever since as the Ley Corta I. A decade later, Andrea Butelmann Peisajoff and Jorge Rodríguez Grossi wrote the chapter that explains what it changed in two places: the rules for building and paying for transmission lines, and the machinery for settling disputes. "Elementos centrales de la Ley Corta I" runs to nine pages in Resolución de discrepancias en el sector eléctrico chileno, the volume the Panel de Expertos published in 2014 to mark its first ten years.
The account matters beyond Santiago. Grid capacity is now the bottleneck for renewable projects in most economies, and the Chilean design — public-service transmission, tendered new lines, a standing tribunal that must pick one side's proposal outright — keeps getting cited as a template. The authors are also candid that the model has a weak spot, one that sits directly under the current debate about how fast networks get built.
What the old rules actually did
Before 2004, transmission in Chile was a private activity with thin regulation. It was a natural monopoly, and everyone knew it, but the law still let users challenge what they were charged. Arbitration was routine. The trouble was that the sums awarded by arbitrators did not necessarily add up to the full recovery of what had been invested, so the promise of a regulated return came with an asterisk.
Each dispute also went to a fresh tribunal assembled for that case alone. There was no continuity, no accumulated reasoning, and, in the authors' words, it was "usual for rulings to be substantially different for similar installations." Investors priced that in. Long stretches of argument, unpredictable outcomes and inconsistent precedent made transmission an uncomfortable place to put money, and the uncertainty spilled into the contracting process for the whole system. Small entrants felt it most.
Ownership made things worse. Until 2001 the country's main generation group and the transmission company of the Sistema Interconectado Central, the central grid, belonged to the same owners. Comparable jurisdictions treat that combination as a problem, on the logic that a network owner with generation interests has both the means and the motive to favour its own plants. Chile had no rule against it.
The dispute machinery had its own defect. Divergences inside each Centro de Despacho Económico de Carga — the load dispatch centres, known as CDECs — could only be resolved by unanimous decision. Unanimity among competitors is close to unattainable, so almost every disagreement was pushed upward to the Comisión Nacional de Energía and then to the minister. The authors are blunt about the consequence: unacceptable pressure and lobbying on a political authority, over questions that plainly needed a public, transparent process with basic legal safeguards such as the right of both sides to be heard.
Four fixes, and a split in how lines get built
The paper records a rare thing in Chilean regulation: broad agreement among analysts on what had to happen urgently. Vertical integration between generation and transmission had to end. Transmission had to be classed as a public service so that an obligation to serve and expand could be imposed. Payment of 100% of remuneration had to be guaranteed in all events. And the dispute forum had to move out of the executive branch into something more modern that produced predictable rulings.
The first item landed in law only partially. The prohibition on integration was written in, but existing minor integrated holdings were recognised, and a large part of the grid had already been sold off by Endesa.
Guaranteeing the full 100% carried its own risk, which the authors flag plainly. The rate of return was set high and held constant, at 10% before tax. With that behind them, a transmitter left to decide for itself what to build would have had every reason to overbuild. So the law paired the guarantee with centralised planning: a participatory procedure covering the whole sector in which the authority only directs and coordinates, and the technical work is done by an independent study. Generators, the transmitter, unregulated customers and the regulator all sit at the table. The study values existing assets and defines what gets built next.
The second design choice proved more consequential. The law separated ampliaciones from obras nuevas. Expansions of an existing facility stay with its owner, though the construction itself must be put out to tender and the study sets a ceiling on its value. Brand-new lines are open to anyone: they go to international public tender, the study's figure is merely indicative, and the winner is whoever offers the lowest annual payment. That payment holds for the first five tariff periods before the asset folds back into the general valuation.
The authors read this as a quiet argument about monopoly. The old assumption treated the entire network as a natural monopoly with declining average costs everywhere. Splitting expansions from new works concedes that a brand-new line need not behave like one.
The results, as tabulated in the paper, show where competition bit and where it didn't:
| Type of work | Reference price from the troncal study (US$ million) | Final awarded price (US$ million) |
|---|---|---|
| New works (international tender) | 189.6 | 164.1 |
| Expansions (built by the incumbent) | 23.4 | 25.7 |
New lines came in below the study's reference figure. Expansions came in above it, which the law tolerates: bids may run up to 15% over the study value. For the authors, that gap is the signature of competition in one column and its absence in the other.
Photo by Gustavo Sánchez on Unsplash
The panel that has to pick a side
Butelmann and Rodríguez Grossi call the Panel de Expertos the reform's biggest innovation, at least in the Chilean regulatory context, and they arrive at it through a tour of what had failed elsewhere. Distribution had a weighting formula for company and regulator studies that rewarded disagreement. Telecommunications and water had three-member expert commissions in which only one member was independent, and because each commission was created ad hoc for a single tariff round, no body of knowledge carried forward.
Electricity needed something stronger, since a centrally dispatched market with constant transfers and re-settlements between agents generates disputes as a matter of routine. The answer was a permanent body, not one convened case by case, so that precedents could accumulate and criteria converge. Its seven members come from different disciplines — lawyers, engineers, economists — and they are chosen by the Tribunal de Defensa de la Libre Competencia through a public competition, which puts their appointment at arm's length from both the energy authorities and the firms they rule on.
Then comes the mechanism that does most of the work. The panel cannot split the difference. It must choose one of the alternatives the parties put before it, with no intermediate values. Think of a line judge who is only allowed to call the ball in or out, never to award half a point. Each side knows that an unreasonable proposal will simply lose, which pushes both toward defensible positions before they ever file. Rulings are due within 30 working days, they bind everyone involved, and no appeal lies against them.
The paper's assessment is that the combination worked: efficient resolution case by case, more legal certainty, clearer precedent, and a visible drop in litigation across the sector because decisions could no longer be reversed through lobbying. It notes that the market and the authorities recognised the design, and that when gas market rules came up for revision, nobody doubted where the disputes would land.
Where the authors say it still falls short
"Regulatory solutions for a sector with so many complexities will never be entirely finished," the authors write, and the last section of the chapter is given over to the gap they see in transmission.
The mismatch is structural. Generation investment in Chile is decentralised and decided by private developers. Transmission investment is centrally planned. Feeding one from the other is not a smooth fit.
The specific complaint is about timing. Because the state guarantees 100% payment in all events, a new line needs a mandate from an evaluation process that runs only once every four years, and that process is anchored in projects already under construction plus the works listed in the Comisión Nacional de Energía's Plan de Obras. That plan, the authors write, is relatively useful for setting short-term prices based on fuel-price developments, but it is "narrow and unreliable" when it comes to investment scenarios. The upshot, in their assessment, is that transmission development still looks insufficient.
They also suspect the guarantee has changed behaviour in a subtler way. The incentive to enter a mandated study may be so strong that it crowds out companies willing to take genuine construction risk on their own.
The case for scepticism
A reasonable critic can accept all of this and still hesitate. Final-offer arbitration produces fast, clean rulings, but it also constrains what a tribunal can say. Where the true answer sits between the parties' positions, the panel must still choose the nearer of two imperfect options, and the reasoning that would explain the compromise never enters the record. Over many cases, that can harden positions rather than refine them, because each side learns to propose the most extreme position that might still win.
The authors themselves point at a related limit in a companion analysis of CDEC procedures published in the same volume, where they find that rulings on self-regulatory matters have not been predictable, and that it is not always foreseeable which disputes will be decided under the loosened decision rule. Predictability, in other words, has been achieved for tariffs and valuations more reliably than for the boundary questions.
Then there is the counterfactual nobody can run. New lines beat their reference prices in Chile partly because the tender was genuinely open. Whether the same design would discipline costs in a market with fewer credible bidders, or with longer permitting timelines, is not something a single country's ten-year record can settle.
Photo by Luckas spalinger on Unsplash
What the next decade of grid-building inherits
The Chilean sequence is worth watching because it inverts the usual order of reform. Most countries liberalise generation first and improvise the network later. Chile wrote the network rules and the dispute forum into the same statute, then let competitive tendering do the cost discipline that regulators elsewhere attempt through benchmarking.
Butelmann brought an unusual vantage point to the exercise. A University of Chicago-trained economist, she ran the Market Development Division at the Ministry of Economy from 2000 to 2004, the years in which the Ley Corta I was drafted, and sat on Chile's competition tribunal from 2004 to 2014. She has since taught regulatory economics and founded Butelmann Consultores.
Her co-author's own numbers tell the story the chapter is making. In a later presentation, Rodríguez Grossi put the saving on tendered new works at 24% below reference and the overrun on expansions at 9% above it, and summed up the reform's lesson in a single line: the old belief in a natural monopoly was resolved with competition.
The unfinished half is the part now under pressure. Chile's grid has to absorb solar and wind farms that did not exist when the four-year study cycle was designed, and the authors' own diagnosis — that a planning process anchored in fuel-price scenarios and existing works will lag a fast-moving generation queue — reads less like an academic caveat and more like an instruction. Watch whether the next round of Chilean reform keeps the panel's forced-choice rule intact. It is the piece that made the rest enforceable.