Optimising site transport deliveries: Modern Methods of Construction (Ref: MMC4-Delivery)
About the Project
Applications of Industrialised Construction (IC) involve producing prefabricated elements in factories, transporting such elements to prepared sites, and assembling these in suitable forms for a safe and operational end product. Variations of such approaches include either whole built modules, e.g. 3D volumetric solutions, or 2D flat-packed systems, often referred to as the Modern Methods of Construction (MMC) Categories 1 and 2. These varied applications of IC are likely to be associated with different transport needs, whereby on-site arrival via predetermined routes plays a critical role. Designing an optimisation system that allows transport operators to select an efficient route consider material nature, environmental factors, and site readiness will be a key within a value chain that determines lead transport times of modules, which are ideally in alignment with both factory production and site readiness. This project aims to link the changes and possible digital applications that need to be made available to optimise existing transport decision-making and arrangements. The PhD is expected to contribute to our body of knowledge around optimising transport of pre-manufactured construction modules, pods, and components under MMC Cat 1 and 2.
Name of primary supervisor/CDT lead:
Dr Ali M. Saad a.saad@lboro.ac.uk
Name of secondary supervisor:
Dr Yasir Ali https://www.lboro.ac.uk/departments/abce/staff/yasir-ali/
Entry requirements:
Applicants should have, or expect to achieve, at least a 2:1 honours degree (or equivalent) in a relevant subject. A relevant master’s degree and/or experience is desirable.
English language requirements:
Applicants must meet the minimum English language requirements. Further details are available on the International website (http://www.lboro.ac.uk/international/applicants/english/).
Bench fees required: No
Closing date of advert: 30th June 2026
Start date: July 2026, October 2026
Full-time/part-time availability: Full-time 3 years
Fee band: 2025/26 Band RB (UK £5,006, International £28,600)
Project search terms:
artificial intelligence, construction management, machine learning, industrialised construction, Modern Methods of Construction (MMC), modular construction, volumetric, prefabrication, digital technologies, digitalisation, transport, logistics, smart systems
Email Address ABCE:
ABCE.pgr@mailbox.lboro.ac.uk
Unlock this job opportunity
View more options below
View full job details
See the complete job description, requirements, and application process






